  Capital Project Cost

 

  Capital Project Cost – Standard Industrial Plant Buildings

  • Standard plant buildings for rent


  • Most plant buildings in TEDA are of light steel structure and single-storied. They range from 2,500 square meters to 10,000 squares in area. Within each building there is a two-storied brick-and-concrete segment which can be used as office.


  • Technical standards


  •  Plant building :

     Floor area

      6300m2

     Structure

      One-storied, light steel structure

     Ground load bearing

      2t/ m2

     Indoor net height

      6m

     Power supply

      500KVA

     Power supply

      150 mm – water pipes, pressure of 0.2 mpa

     Communication

      All communication interfaces completed

     Access roads

      Access roads up to standards




  • The largest industrial plants developers in Tianjin include


  •     Tianjin TEDA Real Estate Development Co., Ltd.

        Tianjin Binhai Development Shareholding Company

        Tianjin TEDA Enterprises Incubator Co., Ltd.




      Capital Project Cost - Land

    1. Overview

    — The elevation of land for industrial uses: 3.50-3.80 meters.
    — Water level: The level of TEDA’s groundwater varies according to different seasons.
        The underground water is 0.60-0.80 meters deep.
    — Freezing depth: The freezing depth is 0.50 -0.60 meters deep.
    — Load bearing of foundation soil: The standard value of the foundation soil load bearing is
        5.5-8 tons per square meter. The exact value of a specific location should be based on
        actual survey.


    2. Sea tide

        Historical records show that the highest sea tide which occurs every 50 years at Bohai Sea
        Bay is of 4.7 meters in elevation and the highest sea tide which occurs every 100 years is
        of 5.18 meters in elevation.


    3. Anti-seismic

        TEDA sits in an area designated by the state as having a seismic intensity of 7. All
        constructions, buildings and engineering projects are designed in accordance with that
        seismic intensity.


    4. Conditions for industrial land usage

        The land for industrial uses in TEDA has been leveled and made suitable for water supply,
        rainwater drainage, power supply, gas supply, heat supply, communications, satellite TV,
        Internet, etc.
     